PC Cluster Consortium

Japanese

Information

2011/11/14 SCore 7.0.2 is released

SCore 7.0.2 is released

2011/10/17 www.pccluster.org will be stopped at Octorber 21 and 22.
For having a power failure, www.pccluster.org will stopped as follows:
    from Octorber 21, 2011 18:00 JST
    to   Octorber 22, 2011 20:00 JST
2011/09/16 www.pccluster.org will be stopped at September 25.
For having a power failure, www.pccluster.org will stopped as follows:
    from September 25, 2011 08:00 JST
    to   September 25, 2011 19:00 JST
2010/12/13 www.pccluster.org will be stopped from December 17 to December 19.
For having a power failure, www.pccluster.org will stopped as follows:
    from December 17, 2010 18:00 JST
    to   December 19, 2010 13:00 JST
2010/12/09 SCore 7.0.1 is released

SCore 7.0.1 is released

2010/11/16 SCore 7 is released

SCore 7 is released

2010/10/12 www.pccluster.org will be stopped at October 22 and 23.
For having a power failure, www.pccluster.org will stopped as follows:
    from October 22, 2010 18:00 JST
    to   October 23, 2010 20:00 JST
2010/09/15 www.pccluster.org will be stopped at September 26.
For having a power failure, www.pccluster.org will stopped as follows:
    from September 26, 2010 11:00 JST
    to   September 26, 2010 19:00 JST
2010/02/17 SCore7 Beta5 is released

SCore7 Beta5 is released.

2010/02/15 www.pccluster.org will be stop at 2/20 and 2/25

www.pccluster.org will be stop at following period:

From Febrary 20 14:00
To   Febrary 20 18:00

From Febrary 25 14:00
To   Febrary 25 18:00

(C) Copyright 2001-2011, PC Cluster Consortium. All rights reserved.